Fortuna Hotel

Location:

6B Lang Ha Street, Ba Dinh District, Ha Noi, Viet Nam

Type of Building: Hotel
New / Refurbished: Refurbished
Status: Operational Stage
Year of construction: 1998
Gross Floor Area: 44205 sq.m
Project-Description:

Fortuna, a four-star hotel, has 200 individually designed guestrooms. The hotel was awarded the third prize among refurbished buildings in the 2010 Energy Efficiency Building Contest. Many energy-saving solutions have been applied – such as using double glazing, high-efficiency lamps and air conditioners.

Third Party Verified: No
Source of Information: Fortuna Hotel
Methods of data collection: interviews with manager and data collection via email.

Hotel Management Company

Phone:
+49 (0) 89 500 78 725

Website:
http://www.keymanagementgroup.com/


Designer/Engineer:

Nguyen Van Vinh
NA

Phone:
(84.4) 3 831 3333

Website:
http://e4g.org


Contractor:

NA
NA

Phone:
NA

Website:
http://e4g.org/

Building Envelope

Windows
The glass windows of the outside layer are covered with a reflective film to reduce the heat gain throughout the building.

Fortuna_hotel
Walls
Color
White and light – yellow painted walls have high solar reflection capacity. They help to reduce the thermal inertia of the building.
Shading
The main entrance is shaded by a buffer zone to reduce solar radiation throughout the lobby.

_DSC0471
Roof – Terrace
A swimming pool on the terrace reduces the solar radiation in the floor below.

1369384610

HVAC

Air conditioning system
650 Split air-conditioners with a Capacity of 3.5 kW and COP of 2.9, a 11.5% improvement over the 2013 EEBC requirement (of 2.6)

Lighting

1. Installation of energy efficient lamps
1000 (9W) Compact fluorescent light lamps and 2500 (5W) Light-Emitting Diodes are used in lobbies, guest rooms and public areas.
2. Control of lighting
Occupation sensors have been installed in the stairs to avoid unnecessary energy consumption

Building Loads

Hot water system
Replacement of a diesel boiler with an efficiency rate of 67.5% with a diesel boiler with a higher efficiency rate of 75%.

Maintenance
Implementation of a preventative maintenance, repair and replacement plan for each family of equipemnt.
Qualified Technical Staff (30 members) in several fields such as eletricity, electronics and plumbing.

Training
Organisation of training courses to raise staff awareness about efficient energy usage.
Staff training in operating and mornitoring is approximately 4 hours/person/year.
Organisation of training courses to enhance skills in specific fields, including fire protection and environmetal management.